In this video, we’ll talk about the Contractor’s Construction and Submittal Schedules, as well as Documents and Samples at the Site. These requirements are in Sections 3.10 and 3.11 of the A201-2017, General Conditions document.
In this video, we’ll talk about the Contractor’s Construction and Submittal Schedules, as well as Documents and Samples at the Site. These requirements are in Sections 3.10 and 3.11 of the A201-2017, General Conditions document.