Subcontractor

Welders working on a skyscraper build

The Subcontractor & Trade’s Guide to Contracting

Guide for 2025 Volumetric Modular Construction Agreements

This guide is intended to examine relationships and issues that occur on volumetric modular construction
(referred to as “VMC”) projects.

Guide to AIA Collaborative Projects Documents

Bricks, a level , yellow hard hat, and rolled blueprints are arranged on a wooden surface. Miniature yellow cranes stand against a riveted metal wall.

Anatomy of a Construction Master Service Agreement

A person's hand draws on blueprints with a pencil, while another uses a tablet, surrounded by a laptop, hard hat, and overlaid digital icons on a desk.

Understanding the Preconstruction Phase

AIA Contract Documents Updated Regional or Urban Planning Scope of Services Document

The Pitfalls of Using Your Own Construction Contract

Maximizing Construction Success: Leveraging Performance Metrics in Contracts

Two construction workers in hard hats are reviewing plans on a tablet at a partially built concrete structure with exposed rebar under a bright sky.

Leveraging AIA Contract Documents Change Orders: Empowering Contractors in Construction Projects

Multiple yellow excavators and a large trencher are parked on an arid dirt landscape. Rocky desert hills rise under a cloudy blue sky.

How the Construction Manager Delivery Method Differs from the Traditional Design-Bid-Build Approach

A person wearing a high-visibility vest holds a white hard hat. They are outdoors with a blurred background showing utility poles and structures.

Contract Basics for Contractors: Contractor Compensation