AIA Document Comparisons
Interested in getting unlimited access to our full 250+ library of agreements and forms?
Visit the link below to learn more: https://shop.aiacontracts.com/unlimited-subscription
Comparisons of current and previous editions of AIA Contract Documents, or basic and special versions (e.g., basic and Sustainable Projects versions), either side by side in a table, or in an underline/strikethrough format showing new and old text.
Conventional (A201)
Current and previous editions, either side-by-side comparison or underline/strikethrough format (comparative).
A101–2017/2007, Owner/Contractor Agreement—Stipulated Sum (comparative)
A102–2017/2007, Owner/Contractor Agreement—Cost Plus Fee, with GMP (comparative)
A103–2017/2007, Owner/Contractor Agreement—Cost Plus Fee, no GMP (comparative)
A104-2017/A107–2007, Owner/Contractor Agreement—Project of Limited Scope (comparative)
A105-2017/2007, Owner/Contractor Agreement-Short Form Agreement (comparative)
A201–2017/2007, General Conditions (comparative)
A401–2017/2007, Contractor/Subcontractor Agreement (comparative)
B101–2017/2007, Owner/Architect Agreement (side-by-side comparison)
B102–2017/2007, Owner/Architect Agreement—no Predefined Scope of Architect’s Services (comparative)
B103-2017/2007, Owner/Architect Agreement-Complex Project (comparative)
B104-2017/2007, Owner/Architect Agreement-Abbreviated Form (comparative)
B105-2017/2007, Owner/Architect Agreement-Short Form (comparative)
C401-2017/2007, Architect/Consultant Agreement (comparative)
Construction Manager as Adviser (CMa)
Current and previous editions, either side-by-side comparison or underline/strikethrough format (comparative).
A132–2019/2009, O/C Agreement, CMa Edition (side-by-side comparison)
A232–2019/2009, General Conditions, CMa Edition (comparative).
B132–2019/2009, O/A Agreement, CMa Edition (side-by-side comparison)
C132–2019/2009, O/CMa Agreement (side-by-side comparison)
Construction Manager as Constructor (CMc)
Side-by-side comparisons of current and previous editions.
A133–2019/2009, Owner/CMc Agreement—Cost of the Work, with GMP
A134–2019/2009, Owner/CMc Agreement—Cost of the Work, no GMP
Contract Administration and Project Management Forms
AIA Bond Form Commentary and Comparison, A310–2010/1970 and A312–2010/1984, Bid Bond, and Performance Bond and Payment Bond