Construction contracts run on precise language, and the same word can carry different weight depending on the agreement and the delivery method. This glossary defines the terms that come up most often on a project, explains what each one means for the work, and points to the AIA document that governs it where one applies.

Jump to a letter, or search for the term you need.

100 terms

No terms match that search. Try a shorter word, or clear the box to see all 100.

A

Addendum

A written change to the bidding documents, issued before the contract is signed.

Because it lands during bidding, an addendum revises the scope every bidder is pricing rather than modifying an executed agreement. Once the contract is signed, changes move to a change order instead.

See also Change Order, Contract Documents, Specifications

Additional Insured

A party added to someone else's insurance policy.

See also Certificate of Insurance, Commercial General Liability Insurance, Indemnification

Allowance

A dollar amount carried in the contract sum as a placeholder for an item whose final cost is not known at bid time.

The contractor prices the labor and installation, so the allowance covers only the material or equipment itself. Once the owner selects the item, a change order adjusts the contract sum up or down to the actual cost.

Governed by A201® – General Conditions of the Contract for Construction

See also Change Order, Contingency, Contract Sum

Application for Payment

The contractor's periodic request for payment covering work.

The architect reviews it and certifies the amount before the owner pays, which creates a professional record of what was actually finished. Submitting it with the continuation sheet every time keeps the paper trail clean.

Governed by G702® – Application and Certificate for Payment

See also Certificate for Payment, Schedule of Values, Progress Payment

Arbitration

A binding dispute process in which a neutral arbitrator hears both sides and issues a decision the parties agreed in advance to accept.

It usually costs less and moves faster than litigation, and the decision is final with very limited grounds for appeal. Which route applies is set in the contract, so choose it deliberately rather than leaving a default in place.

Governed by A201® – General Conditions of the Contract for Construction

See also Mediation, Litigation, Initial Decision Maker

Architect

A professional who is engaged to provide architectural services on a project.

Responsibilities may include design, construction documents, and construction-phase services.

Governed by B101® – Agreement Between Owner and Architect

See also Initial Decision Maker, Owner, Submittal

As-Built Drawings

Drawings recording how the project was actually constructed, including field changes made during the work.

They matter long after closeout, when someone needs to renovate, maintain, or troubleshoot the building. Keeping them current during construction is far easier than reconstructing them at the end.

See also Contract Documents, Final Completion, Specifications

B

Bid Bond

A surety bond guaranteeing that a bidder will enter into the contract at the price bid and provide the required payment and performance bonds.

It protects the owner from a low bidder walking away after the award. If the bidder withdraws, the surety covers the owner's cost of moving to the next bidder.

Governed by A310™ – Bid Bond

See also Payment Bond, Performance Bond, Surety

Builder's Risk Insurance

Property insurance covering the work in progress against physical loss or damage while the project is under construction.

It covers the building itself rather than liability to other people, and it usually ends at substantial completion. Confirm who carries it and what the deductible is before work starts, because the answer varies by project.

Governed by A201® – General Conditions of the Contract for Construction

See also Commercial General Liability Insurance, Waiver of Subrogation, Substantial Completion

C

Certificate for Payment

The architect's certification of the amount due to the contractor based on its Application for Payment.

Governed by G702® – Application and Certificate for Payment

See also Application for Payment, Progress Payment, Architect

Certificate of Insurance

A document from an insurer summarizing the coverage a party carries, including limits and effective dates.

It is evidence of coverage, not the coverage itself, so it does not change what the policy actually says. When a specific endorsement matters, ask for the endorsement rather than relying on the certificate.

See also Additional Insured, Commercial General Liability Insurance, Professional Liability Insurance (Errors and Omissions)

Certificate of Substantial Completion

The signed document establishing the date the work reached substantial completion, with the items still outstanding listed on it.

Signing it starts the warranty period, fixes responsibility for insurance and utilities, and sets the timing of final payment. Leaving it unsigned keeps all three open to argument.

Governed by G704® – Certificate of Substantial Completion

See also Substantial Completion, Punch List, Final Payment

Change Order

A written modification to the contract reflecting an agreed change in the work and any resulting adjustment to the contract sum, contract time, or both.

Governed by G701® – Change Order

See also Construction Change Directive, Contract Sum, Contract Time, Scope of Work

Claim

A demand by one party for an adjustment to the contract sum, the contract time, or another right under the contract.

Contracts set a deadline for raising one, and missing it can cost the right entirely.

Governed by A201® – General Conditions of the Contract for Construction

See also Initial Decision Maker, Mediation, Differing Site Conditions

Collaborative Construction Management

A delivery method that builds on construction manager as constructor by adding structured collaboration during design.

The owner, architect, and construction manager share input and make decisions as a team earlier than conventional CMc delivery allows. It suits projects that need more collaboration than CMc provides but stop short of full integrated project delivery.

Governed by A135™ – Agreement Between Owner and Construction Manager as Constructor (CMc) for Collaborative Project Delivery With Guaranteed Maximum Price

See also Construction Manager as Constructor (CMc), Integrated Project Delivery (IPD), Guaranteed Maximum Price (GMP)

Commercial General Liability Insurance

Liability coverage for bodily injury and property damage a party causes to others during the project.

It responds to third-party harm rather than to defects in the work itself. Required limits are set in the contract, and higher limits are usually reached with an umbrella policy rather than a larger primary one.

Governed by A201® – General Conditions of the Contract for Construction

See also Additional Insured, Professional Liability Insurance (Errors and Omissions), Builder's Risk Insurance

Commissioning

A process for verifying that building systems are planned, designed, installed, tested, and performing in accordance with the project requirements.

See also Final Completion, As-Built Drawings, Inspection

Concurrent Delay

Two or more delays with different causes that overlap in time, at least one of which the contractor is responsible for.

It is the hardest delay question on most projects, because both parties are responsible for the same lost days. Courts and arbitrators handle it inconsistently, so a good baseline schedule and contemporaneous records matter more here than anywhere else.

See also Construction Delay, Excusable Delay, Critical Path

Conditional Lien Waiver

A document effectively stating that lien rights will automatically be waived upon payment. Conditional Lien Waivers usually accompany a pay app submission.

Governed by G901™ – Generic Conditional Waiver and Release on Progress Payment

See also Unconditional Lien Waiver, Lien Waiver, Mechanics Lien

Construction Change Directive

A written order from the owner, prepared by the architect, directing the contractor to proceed with changed work before the parties have agreed on cost or schedule.

The contractor is generally required to proceed and stays entitled to a fair adjustment to the contract sum and contract time. In practice it's the exception, used when the work can't wait. When the parties can settle terms first, a change order is the right document.

Governed by G714® – Construction Change Directive

See also Change Order, Contract Sum, Contract Time

Construction Delay

Any event that pushes work past the date it was scheduled to finish.

Whether it earns more time, more money, both, or neither depends on the cause and on what the contract says. Document the cause and the impact as they happen, since reconstructing them later rarely persuades anyone.

See also Excusable Delay, Concurrent Delay, Liquidated Damages

Construction Manager

A professional that the owner engages to manage cost, schedule, and coordination on a project.

The title covers two very different roles. As an advisor, the construction manager consults while the owner holds the trade contracts. As a constructor, the construction manager builds the project and holds the subcontracts.

See also Construction Manager as Advisor (CMa), Construction Manager as Constructor (CMc), Owner

Construction Manager as Advisor (CMa)

A delivery method in which the construction manager advises the owner throughout design and construction while the owner contracts directly with the trade contractors.

The owner keeps control of each trade contract and gets professional coordination across all of them. It suits phased or fast-track work, where early packages are released before the design is finished.

Governed by A232® – General Conditions Construction Manager as Advisor (CMa)

See also Construction Manager as Constructor (CMc), Construction Manager, Fast-Track Construction

Construction Manager as Constructor (CMc)

A delivery method in which the construction manager joins during preconstruction to advise on cost and constructability, then builds the project under a single contract.

The owner gets early construction input while the design develops, then one accountable builder. The price is usually set later as a guaranteed maximum price, once the design is far enough along to estimate with confidence.

Governed by A133® – Agreement Between Owner and Construction Manager as Constructor (CMc) With Guaranteed Maximum Price

See also Guaranteed Maximum Price (GMP), Construction Manager at Risk (CMAR), Collaborative Construction Management, Volumetric Modular Construction

Construction Manager at Risk (CMAR)

Another name for the construction manager as constructor delivery method, used most often by public agencies.

The two terms describe the same arrangement and are interchangeable in practice. Read the agreement rather than the label, since the risk transfer depends on the contract and not the acronym.

Governed by A133® – Agreement Between Owner and Construction Manager as Constructor (CMc) With Guaranteed Maximum Price

See also Construction Manager as Constructor (CMc), Guaranteed Maximum Price (GMP)

Construction Schedule

The contractor's plan showing the sequence and timing of the work from start to completion.

It is the baseline every delay claim is measured against, so an unrealistic or unsubmitted schedule weakens the contractor's position later. Most contracts require it early and require updates as the work proceeds.

Governed by A201® – General Conditions of the Contract for Construction

See also Critical Path, Float, Milestone

Contingency

A reserve of money held for costs that may or may not arise, not assigned in advance to any specific scope item.

It differs from an allowance, which holds a place for a known item at an unknown price. How it can be drawn depends entirely on what the parties negotiated, so define that before signing.

See also Allowance, Guaranteed Maximum Price (GMP), Contract Sum

Contract Documents

The set of documents that together form a contract, which may include the agreement, conditions of the contract, drawings, specifications, addenda, and modifications.

Governed by A201® – General Conditions of the Contract for Construction

See also Specifications, Supplementary Conditions, Addendum

Contract Sum

The total amount payable under the contract for the work, subject to authorized adjustments.

Changes to the Contract Sum should be documented through the contract's established modification procedures. Clear documentation helps parties track how and why the amount changes over the course of the project.

Governed by A101® – Agreement Between Owner and Contractor

See also Change Order, Contract Time, Cost of the Work

Contract Time

The period the contract allows for reaching substantial completion, measured from the date the work is authorized to begin.

Milestones, phasing, and the completion date all hang off it, as do liquidated damages if it is blown. Check every approved scope change for its effect on time, not only on price.

Governed by A101® – Agreement Between Owner and Contractor

See also Notice to Proceed, Substantial Completion, Liquidated Damages

Correction of Work

The contractor's obligation to fix work that does not conform to the contract documents.

It runs separately from the warranty, typically for one year after substantial completion, though the underlying obligation to build to the contract does not expire with it. Rejecting nonconforming work early costs everyone less than correcting it at close out.

Governed by A201® – General Conditions of the Contract for Construction

See also Warranty, Punch List, Inspection

Cost of the Work

The actual documented cost of performing the work, as defined in a cost-plus or guaranteed maximum price agreement.

Governed by A103® – Agreement Between Owner and Contractor, Cost Plus Fee Without Guaranteed Maximum Price

See also Cost-Plus Contract, Guaranteed Maximum Price (GMP), Contract Sum

Cost-Plus Contract

An agreement under which the owner reimburses the contractor's actual costs and pays a separate fee covering overhead and profit.

It suits work whose scope is still evolving, since it does not require a complete design to price. The owner carries the cost risk unless a guaranteed maximum price is added, which is why most owners add one.

Governed by A103® – Agreement Between Owner and Contractor, Cost Plus Fee Without Guaranteed Maximum Price

See also Guaranteed Maximum Price (GMP), Cost of the Work, Fixed-Price Contract (Stipulated Sum)

Critical Path

The longest continuous chain of activities in the schedule, where any delay pushes the completion date.

Only delays on this path move the finish, which is why a late activity with float can cost nothing at all. Time extension claims usually turn on whether the delayed work sat on it.

See also Float, Construction Schedule, Construction Delay

D

Design-Bid-Build

A delivery method in which the owner hires a designer, completes the design, then bids the construction to contractors.

Governed by A101® – Agreement Between Owner and Contractor

See also Design-Build, Construction Manager as Advisor (CMa), Fixed-Price Contract (Stipulated Sum)

Design-Build

A delivery method in which a single entity holds responsibility for both the design and the construction of a project.

The owner signs one contract and has one point of accountability, which speeds decisions and closes the coordination gap between the designer and the builder. The trade-off is less direct owner control over design.

Governed by A141® – Agreement Between Owner and Design-Builder

See also Design-Bid-Build, Progressive Design-Build, Design-Builder, Turnkey Contract

Design-Builder

The single entity that contracts with the owner to both design and construct the project.

It may be a contractor with a design firm beneath it, a designer with a builder beneath it, or a joint venture of the two. Whichever shape it takes, the owner looks to one party for both halves of the work.

Governed by A141® – Agreement Between Owner and Design-Builder

See also Design-Build, Progressive Design-Build, Owner

Differing Site Conditions

Differing site conditions refer to physical conditions which were not previously known or expected, and they can differ greatly in severity and impact. They are common grounds for a legitimate claim, and most contracts require documentation (e.g. photographs) and prompt written notice before the conditions are disturbed.

Governed by A201® – General Conditions of the Contract for Construction

See also Claim, Construction Delay, Change Order

E

Excusable Delay

A delay caused by something outside the contractor's control that earns additional contract time under the agreement.

Some can be compensated, and some extend the schedule without adding money; the contract decides which. Weather, owner-directed changes, and differing site conditions are the usual candidates.

Governed by A201® – General Conditions of the Contract for Construction

See also Construction Delay, Concurrent Delay, Force Majeure

F

Fast-Track Construction

A schedule strategy in which construction begins on early packages before the full design is complete.

It compresses the overall schedule and exposes every gap in the contract, since scope and pricing evolve while work is already underway. It needs a delivery method built for overlapping phases rather than a sequential agreement.

See also Construction Manager as Advisor (CMa), Progressive Design-Build, Volumetric Modular Construction

Final Completion

The point at which all work, including everything on the punch list, is finished and accepted.

It follows substantial completion and releases the remaining retainage along with final payment. Confirming lien waivers and the contractor's affidavits at this stage protects the owner from later claims.

Governed by G706® – Contractor's Affidavit of Payment of Debts and Claims

See also Substantial Completion, Final Payment, Punch List

Final Lien Waiver

A waiver releasing lien rights for the entire project, typically given in connection with final payment.

It waives all lien rights, rather than covering a single progress payment, so it deserves a careful read before signing. The conditional version is safer until the final check has cleared.

Governed by G903™ – Generic Conditional Waiver and Release on Final Payment

See also Lien Waiver, Conditional Lien Waiver, Final Payment

Final Payment

The last payment under the contract, releasing the remaining balance, including retainage.

Governed by G706® – Contractor's Affidavit of Payment of Debts and Claims

See also Final Completion, Retainage, Final Lien Waiver

Fixed-Price Contract (Stipulated Sum)

An agreement to complete a defined scope of work for one agreed amount, adjusted only through approved changes.

The contractor keeps any savings and absorbs any overruns, which gives the owner the most price certainty of any structure. It works only when the design is complete enough to price accurately.

Governed by A101® – Agreement Between Owner and Contractor

See also Lump Sum Contract, Cost-Plus Contract, Guaranteed Maximum Price (GMP)

Float

The amount of time an activity can slip without pushing the project completion date.

The contract should settle who owns it. Where it is shared, the first party to consume it gets the benefit, which is why owners and contractors often argue about it after the fact.

See also Critical Path, Construction Schedule, Construction Delay

Flow-Down Provisions

Clauses in a subcontract binding the subcontractor to the same or similar obligations the contractor owes the owner under the prime contract.

They keep responsibilities aligned down the whole contract chain, which means a subcontractor needs to read the prime contract and not only their subcontract. Conflicts between the two are a frequent source of disputes.

Governed by A401® – Agreement Between Contractor and Subcontractor

See also Prime Contract, Subcontract, Subcontractor

Force Majeure

A contract clause excusing performance when an extraordinary event outside either party's control prevents it.

What qualifies depends entirely on the wording, and courts read these clauses narrowly. Most grant more time rather than more money, so check whether costs are recoverable before relying on it.

Governed by A201® – General Conditions of the Contract for Construction

See also Excusable Delay, Construction Delay, Claim

G

General Conditions

The umbrella document that defines each party's obligations, including the rights, responsibilities, and relationships of the owner, contractor, architects, and subcontractors on design-bid-build projects.

Governed by A201® – General Conditions of the Contract for Construction

See also Contract Documents, Supplementary Conditions, Prime Contract

General Contractor

The person or firm who contracts with the owner to build the project, including hiring, scheduling, and managing subcontractors, and overseeing additional aspects of the project.

Governed by A101® – Agreement Between Owner and Contractor

See also Subcontractor, Prime Contract, Owner

Guaranteed Maximum Price (GMP)

A type of cost-plus agreement that establishes a price cap the owner will pay for the cost of the work, plus the contractor's fee. The owner reimburses the contractor for the actual allowable costs, but only up to the guaranteed maximum price, unless the contract allows for adjustments.

A GMP contract provides visibility into the actual reimbursable costs because the contractor's payment is based on documented reimbursable expenses rather than a predetermined lump sum.

Governed by A102® – Agreement Between Owner and Contractor, Cost Plus Fee with Guaranteed Maximum Price

See also Cost-Plus Contract, Contingency, Value Engineering

I

Indemnification

The transfer of risk from one party to another, requiring one party to assume responsibility for third-party claims made against the other party.

Governed by A201® – General Conditions of the Contract for Construction

See also Additional Insured, Commercial General Liability Insurance, Waiver of Subrogation

Initial Decision Maker

The person designated to review claims and issue the first decision before a dispute can move to mediation.

It is usually the architect unless the parties name someone else.

Governed by A201® – General Conditions of the Contract for Construction

See also Claim, Mediation, Arbitration

Inspection

Examination of the work to confirm it conforms to the contract documents or to applicable code.

Governed by A201® – General Conditions of the Contract for Construction

See also Correction of Work, Commissioning, Punch List

Integrated Project Delivery (IPD)

A delivery method in which the owner, designer, and builder work as a unified team and share both risk and reward.

A defining feature of IPD is the shared financial structure. Project participants tie their profits to overall project success, creating a strong incentive to deliver quality work, control costs, and meet deadlines.

Governed by A195™ – Agreement Between Owner and Contractor for Integrated Project Delivery

See also Design-Build, Construction Manager as Constructor (CMc), Value Engineering

J

Joint Check Agreement

A contractual agreement whereby payment is issued to two or more parties together, typically a subcontractor and its supplier.

See also Lien Waiver, Mechanics Lien, Progress Payment

L

Lien Waiver

A signed document that waives the right to file a construction lien. They're often included alongside pay apps. When payment is requested, a corresponding lien waiver is usually submitted to show that the submitter waives their right to file a construction lien in exchange for payment.

Governed by G901™ – Generic Conditional Waiver and Release on Progress Payment

See also Conditional Lien Waiver, Unconditional Lien Waiver, Partial Lien Waiver, Mechanics Lien

Liquidated Damages

Specific damages that must be paid due to breaching the contract, typically relating to project milestones and completion deadlines. By using a liquidated damages formula, the parties can avoid having to calculate actual damages in the event of a breach. The amount is usually calculated on a per-day basis and often features a “cap” or maximum.

Governed by A101® – Agreement Between Owner and Contractor

See also Contract Time, Excusable Delay, Substantial Completion

Litigation

The formal process of resolving disputes through the court system. Parties will be bound by relevant rules of civil procedure, rules of evidence, and any local rules. Unlike arbitration, a decision through the court system will be based on existing legal decisions, called “precedent,” and can create new legal precedent.

Governed by A201® – General Conditions of the Contract for Construction

See also Arbitration, Mediation, Claim

Lump Sum Contract

A lump sum contract is an agreement where a contractor agrees to complete construction services for a fixed price. Unlike other contract types where expenses are itemized, a lump sum contract focuses solely on the total cost of the build, offering simplicity for both parties involved.

Governed by A101® – Agreement Between Owner and Contractor

See also Fixed-Price Contract (Stipulated Sum), Contract Sum

M

Mechanics Lien

A legal claim on a property by an unpaid contractor or material supplier.

Mechanics liens are typically only available on private construction projects.

Governed by G706A® – Contractor's Affidavit of Release of Liens

See also Lien Waiver, Preliminary Notice, Payment Bond

Mediation

A non-binding process in which a neutral mediator helps the parties negotiate their own settlement. Mediation is typically faster and less expensive than formal proceedings.

Governed by A201® – General Conditions of the Contract for Construction

See also Arbitration, Litigation, Initial Decision Maker

Milestone

A fixed date in the schedule marking a required intermediate event, such as topping out or the start of a phase.

See also Construction Schedule, Contract Time, Substantial Completion

N

Notice to Proceed

A notification letter authorizing project work to begin. Any party that has hired another party on the project may utilize a notice to proceed to indicate the recipient should start their work. The date indicated in the notice to proceed usually starts the clock on contract time and every milestone that follows.

Governed by A101® – Agreement Between Owner and Contractor

See also Contract Time, Milestone, Substantial Completion

O

Owner

The party that initiates the project, assembles the team, secures financing, approves budgets, manages business objectives, and ultimately carries the financial risk tied to the outcome.

Governed by A101® – Agreement Between Owner and Contractor

See also Architect, General Contractor, Claim

P

Partial Lien Waiver

A waiver releasing lien rights for a portion of the project.

Governed by G901™ – Generic Conditional Waiver and Release on Progress Payment

See also Lien Waiver, Final Lien Waiver, Progress Payment

Pay-If-Paid

A contractual provision, often found in subcontracts, where the owner's payment to the contractor is a condition precedent to the subcontractor being paid. In other words, if the contractor doesn't get paid, the subcontractor doesn't get paid. These clauses aren't always enforceable.

Governed by A401® – Agreement Between Contractor and Subcontractor

See also Pay-When-Paid, Subcontract, Progress Payment

Pay-When-Paid

A contractual provision, often found in subcontracts, that delays the time within which the contractor must pay its subcontractor after being paid by the owner. In other words, it only affects timing, not the subcontractor's right to eventually be paid.

Governed by A401® – Agreement Between Contractor and Subcontractor

See also Pay-If-Paid, Subcontract, Joint Check Agreement

Payment Bond

An assurance by the contractor and the contractor's surety that labor and materials bills incurred in connection with the construction contract will be paid.

Governed by A312® – Payment Bond

See also Performance Bond, Surety, Mechanics Lien

Performance Bond

An assurance by the contractor and the contractor's surety that the work will be performed and completed in accordance with the terms of the construction contract.

Governed by A312® – Performance Bond

See also Payment Bond, Surety Bond, Bid Bond

Preliminary Notice

An early written notice, required by many states, telling other parties on a project who is working on site. The notice also typically explains the type of work being done, when the contractor will begin, and who hired them. It may include the value of the work.

See also Mechanics Lien, Lien Waiver, Subcontractor

Prime Contract

The primary agreement between the owner and the main party responsible for delivering the project. Every subcontract sits beneath it and usually inherits its terms through flow-down provisions.

Governed by A101® – Agreement Between Owner and Contractor

See also Subcontract, Flow-Down Provisions, General Conditions

Professional Liability Insurance (Errors and Omissions)

Coverage for claims alleging mistakes in professional services, such as design errors, omissions, or failing to meet a professional standard.

General liability policies exclude this, which is why design professionals carry it separately, and builders need it too. It is typically written on a claims-made basis, so the policy has to be live when the claim is filed rather than when the work was done.

Governed by B101® – Agreement Between Owner and Architect

See also Commercial General Liability Insurance, Certificate of Insurance, Design-Builder

Progress Payment

A periodic payment covering the portion of the work completed during a billing period.

It is calculated from the schedule of values, certified by the architect, and reduced by retainage. Submitting on a predictable cycle is what keeps cash moving on a project.

Governed by G702® – Application and Certificate for Payment

See also Application for Payment, Schedule of Values, Retainage

Progressive Design-Build

A delivery method in which the owner maintains a single contractual relationship with the design-builder, and responsibility for design and construction flows through that entity.

Instead of establishing the price based on a relatively early design, the owner, design-builder, and architect collaborate as the design develops.

Governed by A141PDB® – Standard Form of Agreement Between Owner and Design-Builder for a Progressive Design-Build Project

See also Design-Build, Guaranteed Maximum Price (GMP), Fast-Track Construction

Punch List

The list of incomplete or non-conforming work items remaining before the work reaches substantial completion.

Final payment is usually released when the punch list items have been completed.

Governed by G704® – Certificate of Substantial Completion

See also Substantial Completion, Final Completion, Final Payment

R

Request for Information (RFI)

A written request for information from another party to seek clarification about the project, plans, materials, etc.

RFIs are commonly used by a sub-tier party (like a subcontractor, sub-subcontractor, or supplier).

Governed by G716™ – Request for Information (RFI)

See also Change Order, Contract Documents, Construction Delay

Retainage

A percentage typically withheld from a contractor throughout the duration of the project, and only paid after substantial completion.

Governed by A101® – Agreement Between Owner and Contractor

See also Progress Payment, Final Payment, Substantial Completion

S

Schedule of Values

An itemized list that allocates the entire contract sum to the various portions of the work.

A schedule of values is typically used when the contractor is paid on a stipulated sum or guaranteed maximum price basis, and it acts as the basis for the architect's review of the contractor's applications for payment.

Governed by G703® – Continuation Sheet

See also Application for Payment, Progress Payment, Contract Sum

Scope of Work

A party's scope of work refers to what that party's role and obligations are for the project, and it should be clear from the project documents. The scope of work explains what work they will do, and it creates boundaries, so it's clear what work they are not responsible for.

The scope of work generally includes a description of the work to be performed, including labor, materials, equipment, and services required to complete the job.

Governed by A201® – General Conditions of the Contract for Construction

See also Contract Documents, Specifications, Change Order

Shop Drawings

Drawings, diagrams, schedules, and other data prepared by the contractor showing how a portion of the work will be fabricated, assembled and installed.

Governed by A201® – General Conditions of the Contract for Construction

See also Submittal, Specifications, Contract Documents

Specifications

The written requirements for materials, equipment, systems, and workmanship on the project.

They work alongside the drawings rather than beneath them: the drawings show what goes where, while the specifications outline standards and how things come together.

Governed by A201® – General Conditions of the Contract for Construction

See also Contract Documents, Shop Drawings, Request for Information (RFI)

Subcontract

The agreement between a contractor and a trade firm covering a defined portion of the work.

It usually incorporates the prime contract through flow-down provisions.

Governed by A401® – Agreement Between Contractor and Subcontractor

See also Flow-Down Provisions, Prime Contract, Pay-If-Paid

Subcontractor

A party contracting with the contractor to perform a portion of the larger project.

Typically, the subcontractor's agreement is with the general contractor, not the owner.

Governed by A401® – Agreement Between Contractor and Subcontractor

See also Subcontract, Flow-Down Provisions, Mechanics Lien

Submittal

A document or sample the contractor provides for approval by the design team before fabrication or installation.

Shop drawings, product data, and mockups are common types.

Governed by A201® – General Conditions of the Contract for Construction

See also Shop Drawings, Specifications, Construction Schedule

Subrogation

Subrogation allows an insurer to step into the shoes of their customers and pursue third parties who caused a loss that the insurer had to cover.

Construction contracts usually waive it between the parties so that an insured loss does not turn into litigation inside the project team and put the project at risk.

Governed by A201® – General Conditions of the Contract for Construction

See also Waiver of Subrogation, Builder's Risk Insurance, Indemnification

Substantial Completion

The point at which the work is sufficiently complete under the contract documents for the owner to occupy or use it for its intended purpose, even with minor items outstanding.

Governed by G704® – Certificate of Substantial Completion

See also Certificate of Substantial Completion, Punch List, Final Completion

Supplementary Conditions

Modifications to the base contract documents, written for a specific project.

Read them against the general conditions, since they override rather than supplement the original contract documents.

Governed by A201® – General Conditions of the Contract for Construction

See also General Conditions, Contract Documents, Prime Contract

Surety

The issuer of a bond, typically an insurer or bank. The surety guarantees that the principal will meet their obligations to the obligee.

See also Surety Bond, Performance Bond, Payment Bond

Surety Bond

A contractual agreement between three parties in which a surety promises the owner that the contractor will meet a specific obligation.

Governed by A312® – Performance Bond

See also Bid Bond, Performance Bond, Payment Bond

T

Termination for Cause

Ending the contract because the other party has failed to meet a material obligation.

Governed by A201® – General Conditions of the Contract for Construction

See also Termination for Convenience, Claim, Correction of Work

Termination for Convenience

Ending the contract simply because one party decides to.

Governed by A201® – General Conditions of the Contract for Construction

See also Termination for Cause, Final Payment, Contract Sum

Time and Materials (T&M)

A pricing method under which compensation is based on payment for cost of labor, equipment, materials, and services, plus a fee to cover overhead and profit.

Governed by A104® – Abbreviated Agreement Between Owner and Contractor

See also Cost-Plus Contract, Unit Price Contract, Contingency

Turnkey Contract

An arrangement in which one party delivers a complete, ready-to-use facility to the owner.

It concentrates responsibility and reduces the owner's involvement during delivery, at the cost of day-to-day control. The label is descriptive rather than a defined AIA structure, so what it means depends on the agreement.

Governed by A141® – Agreement Between Owner and Design-Builder

See also Design-Build, Design-Builder, Integrated Project Delivery (IPD)

U

Unconditional Lien Waiver

A waiver that releases lien rights once signed and submitted.

Governed by G902™ – Generic Unconditional Waiver and Release on Progress Payment

See also Conditional Lien Waiver, Lien Waiver, Mechanics Lien

Unit Price Contract

An agreement setting a fixed price per unit of work, with the total depending on the quantities actually installed.

A unit price contract is common for civil, utility, and infrastructure projects where quantities can't be accurately determined before work begins.

Governed by A201® – General Conditions of the Contract for Construction

See also Fixed-Price Contract (Stipulated Sum), Time and Materials (T&M), Schedule of Values

V

Value Engineering

A structured review of project components aimed at finding low-cost alternatives while preserving the function the owner needs.

See also Guaranteed Maximum Price (GMP), Contingency, Change Order

Volumetric Modular Construction

A delivery method in which building components are fabricated off site as complete modules, then assembled on site.

The Volumetric Modular Construction family is designed for coordinated delivery between owner, construction manager, architect, and modular subcontractor, often using a guaranteed maximum price structure and overlapping design and construction phases.

Governed by A181™ – Agreement Between Owner and Construction Manager as Constructor, Volumetric Modular Construction

See also Construction Manager as Constructor (CMc), Fast-Track Construction, Guaranteed Maximum Price (GMP)

W

Waiver of Subrogation

A contract provision under which the parties give up their insurers' ability to pursue each other for losses covered by insurance. This is common in construction, where litigation between project participants will negatively affect project outcomes.

Governed by A201® – General Conditions of the Contract for Construction

See also Subrogation, Builder's Risk Insurance, Indemnification

Warranty

A promise that materials and/or workmanship will meet requirements and be free of defects, generally limited by a scope of time. Architects, contractors, and subcontractors may warrant some or all of their work, and construction materials typically come with some type of warranty.

Governed by A201® – General Conditions of the Contract for Construction

See also Correction of Work, Substantial Completion

Warranty Bond

Also known as a maintenance bond, this guarantees that the contractor will uphold their warranty obligations after the project is completed. Typically lasting between one and two years, warranty bonds ensure the contractor's work meets quality standards.

Governed by A313™ – Warranty Bond

See also Warranty, Surety Bond, Performance Bond